Specification
|
|
Our service
|
CNC Turning, CNC Milling, Laser Cutting, Bending, , Wire Cutting, Stamping, Electric Discharge Machining (EDM).
|
Material
|
Aluminum, Stainless Steel, Brass, Copper, Titanium, Plastic, Inconel 718, Pure nickel N6,17-4PH Steel Cond H1150,9310 alloy steel, Non-magnetic steel HPM75
|
Surface treatment
|
Plating, Brushing, Polishing, Anodizing, Sandblasting, Knurling, or customer's requirements
|
Application
|
Automotive, Electronic device, Digital communication, UAV, Aerospace, Bicycle, Pneumatic tools, Hydraulic, Automatic Equipment,etc
|
Drawing Format
|
IGS, STP, X_T, DXF, DWG, Pro/E, PDF, PNG, JPG
|
Surface Roughness
|
Min Ra 0.1~3.2
|
Tolerance
|
±0.01mm~±0.05mm
|
MOQ
|
Quantity is not limited, small order can be accepted
|
Delivery Time
|
5-25 Days, Depends on the quantity
|
CNC is the abbreviation of Computerized Numerical Control Machine (computer numerical control lathe), also known as CNC numerical control lathe, CNC lathe, Guangdong Pearl River Delta region and Hong Kong called computer gong. Compared with ordinary lathes, CNC lathes have the following characteristics: high product processing accuracy and stable product quality. The lathe has a high degree of automation, which can reduce the labor intensity of production; multi-coordinate linkage is suitable for processing complex parts. When machining parts are replaced, it is generally not necessary to change the NC program, which can save production preparation time. The lathe itself has high precision and strong rigidity, and the processing volume can be selected. High production efficiency (generally 3-5 times that of ordinary lathes); higher requirements for the comprehensive quality of operators and higher comprehensive technical requirements for maintenance personnel.Custom 5 axis cnc milling parts-CNC machining center processing
FAQ:
A: We are factory.
A: sample time 10-20 days if mould needed;
sample time within 10 days if no mould needed
A: we could offer the sample for free charge but do not pay the cost of freight.
1. 50% mould cost paid to start the mould
2. 50% mould cost paid after the sample approved
3. 40% advance payment to start the mass production
4. 60% balance at the sight of copy of B/L