Product description
Products Name: cnc machining part/ CNC Turning stainless steel parts
CNC milling services for aerospace, appliance, automotive, building, chemical, marine, mining and various other applications. Plastics, aluminum, brass, bronze, stainless steel, titanium, carbon steel and various other materials worked with. Capable of handing parts up to 120 in. maximum length with +/-0.0002 in. tolerance. Various capabilities include drilling, boring, tapping, positioning, marking, assembly, punching, welding, broaching and honing. JIT delivery.
Main Material: Aluminium Alloy
Process: CNC milling, drilling
Application fields: Automotive, Automation, Test systems, Sensors, Medical, Sports, Consumer, Home appliance, Electronic, Pumps, Computers, Power and energy, Architecture, Printing, Food, Textile machinery, Optical, Lighting, Security and safety, etc
Advantages:
1) Provide non-standard/standard /OEM/ custom services CNC Lathe
2) High precision, tolerance up to 0.005mm
3) Short delivery cycle (5-7 days for samples, 12-15 days for mass production)CNC 4 Axis 5 Axis

Material
Aluminum: AL5052, AL6061, AL6063, AL2017, AL7075, etc
Stainless Steel Alloy: SS303, SS304, SS316, SS412, etc
Steel Alloy: Carbon Steel, Die Steel, Spring Steel, Cold Rolled Steel etc
Brass Alloy: 3602, 2604, H59, H62, etc.
Other Special Materials: Copper, Plastics, Lucite, Nylon, Bakelite, Carbon, PP, PC, PE, PEEK, Titanium etc
Surface Finishing: Anodizing, Bead Blasting, Hard Coat Anodizing, Heat-treating, Induction Heat Treating, Laser Etching, Pad Printing, Painting,Parkerizing, Plating, Polishing. Powder Coating, Precious Metal Plating
Process Drawing&Samples-Mould making-Die casting-Deburring-Drilling and threading- CNC Machining-Polshing-Surface treatment-Assembly-Quality inspection-Packing-Shipping
Tolerance: According to drawings.
Equipment: Vertical Machining Center, Vertical Drilling Center, 4-Axis Machining Center, Turning Machine, Drilling Machine, Sawing Machine, Hydraulic Press, Air Leak Tester, CMM
Preferred formats:JPEG, PDF, PNG, CAD, IGS, UG, Solidworks
Loading port: Chongqing
Delivery time: 20-30 days after receiving orders,usually based on customers' PO QTY
Note: Above item is only for your reference,not for sales;we only produce parts based on customer's drawings
We are devoting ourselves to achieve high quality products, competitive prices and on-time delivery.